Pat Ernst of the USDA's Natural Resources Conservation Service and Wally Broering, Wabash River Conservancy District president, stand on dam 1 south of Eldora Speedway Tuesday morning. Behind the dam is a lake constructed to retain water and capture sediment. The cement structure with a ladder is called a principal spillway riser. Ernst was performing his annual inspection of the three flood control dams on the river.