a_d
Thursday, May 13th
Vehicles wait in lines along the perimeter of the Sheetz in Raleigh, N.C., as a tanker truck finishes delivering a 9000 gallon load of fuel Thursday, May 13, 2021. Operators of the Colonial Pipeline say they began the process of moving fuel through the pipeline again on Wednesday, six days after it was shut down because of a cyberattack. (Travis Long/The News & Observer via AP)